--:--:--
⬤ LOW 09 Sep 2026, 11:05 UTC

Koryx Copper Announces Further Drill Results at the Haib Copper Project in Southern Namibia

Highlights  Assay results reported for 15 drill holes comprising 6,825m of infill and expansion drilling. Consistent, wide intercepts incl. 318m @ 0.49% CuEq (162 – 480m) and 220m @ 0.40% CuEq (32-252m) with higher grades across multiple holes (incl. 12m @ 2.55% CuEq (from surface), 10m @ 1.78% CuEq and 32m @ 1.06% (from 224m)) […]
\
Terms of Service