--:--:--
⬤ LOW 18 Sep 2026, 17:09 UTC

Bristol’s £9.7m Harbour Walkway links Temple Meads to £500m campus

Bristol City Council spent £9.7 million on a 400-metre floating Harbour Walkway, initially estimated at £2.5 million and designed to connect Temple Meads station to a planned music arena. The arena was later moved to Filton. The walkway now connects the station’s new eastern entrance with the University of Bristol’s £500 million campus.
\
Terms of Service