--:--:--
⬤ LOW 26 Aug 2026, 11:05 UTC

Koryx Copper Announces Further Drill Results at the Haib Copper Project in Southern Namibia

969m @ 0.27% Cu Eq, the Longest Continuously Mineralised Intersection Drilled at Haib to Date Highlights  Assay results reported for 19 drill holes comprising over 8,586m of infill drilling. Consistent, wide intercepts up to 969m in width, including 236m @ 0.57% CuEq. High-grade mineralisation from surface in HM177, including 30m @ 1.10% CuEq. All 19 […]
\
Terms of Service