CMRL’s phase 2 corridor cuts through roof of MRTS station at Adambakkam
To build this unconventional alignment of corridor 5, Metro Rail dismantled part of the station roof and parapet wall; they decided to retain the design, despite high construction costs, to avoid disturbing residences in the locality, says an official
\