Osisko Gold Confirms Presence of Mineralized System with Open Pit Potential at the Proserpine Target on the Cariboo Gold Project’s Regional Property; Exploration Drilling Highlights Include 95.93 g/t Au over 4.60 m at 71 m Vertical Depth and 5.46 g/t Au over 8.60 m at 77 m Vertical Depth
HIGHLIGHTS 6,463 m in 14 drill holes of new surface exploration drilling at the Proserpine regional exploration target, located 7 km along strike to the southeast of the Cariboo Gold deposit Results confirm the presence of an emerging gold mineralized system comprising high-grade structures exhibiting similarities to those at the Cariboo Gold deposit that, together […]
\