Bulk liquids aren't permitted at Roberts Bank. How does that impact the plan for a $44-billion oil terminal and pipeline?
In the 1970s, a federal panel concluded that the shipment of bulk liquids would pose “unacceptable risks" to the Roberts Bank ecosystem.
\