--:--:--
⬤ MEDIUM 08 Jul 2026, 21:19 UTC

Osisko Development Extends Gold Mineralization at Cariboo Gold Project Beyond 700 m Vertical Depth in Previously Untested Areas; Intercepts Include 13.19 g/t Gold Over 3.60 m at 596 m Vertical Depth and 28.90 g/t Gold Over 0.50 m at 718 m Vertical Depth

HIGHLIGHTS 8,971 m of new surface exploration drilling designed to test near mine potential at depth and in under-drilled gap zones between defined deposit footprints. Approximately 65% of drilling transected areas outside the Cariboo Gold deposit. Highlight intercepts from outside the footprint of the current mineral resource across multiple zones on strike, include: 13.19 g/t […]
\
Terms of Service